涤纶短纤维生产中纺丝组件更换周期优化控制
金辉;王建辉;李天臣;
Optimal control replacing period for spin pack in polyester staple fiber plant
Jin, Hui (1); Wang, Jian-Hui (1); Li, Tian-Chen (2)
东北大学学报(自然科学版) . 2008, (8): 1080 -1082 .  DOI: -