无缝钢管集成生产调度模型
李建祥;唐立新;吴会江
Modeling of integrated production scheduling for seamless steel tube
Li, Jian-Xiang (1); Tang, Li-Xin (1); Wu, Hui-Jiang (2)
东北大学学报(自然科学版) . 2004, (12): 1145 -1148 .  DOI: -