自动优化露天矿短期进度计划的渐进细化法
孙效玉;张维国;孙梦红;
Progressive thinning algorithm for automatic optimization of short-term scheduling of open-pit mine
Sun, Xiao-Yu (1); Zhang, Wei-Guo (1); Sun, Meng-Hong (2)
东北大学学报(自然科学版) . 2012, (5): 735 -738 .  DOI: -