露天边帮下紧邻尾矿库采空区地表充填治理方法

任思潼1, 顾晓薇1, 付煜1, 李传迎2   

  1. (1. 东北大学 资源与土木工程学院, 辽宁 沈阳110819; 2. 辽宁排山楼黄金矿业有限责任公司, 辽宁 阜新123000)
  • 收稿日期:2016-12-14 修回日期:2016-12-14 出版日期:2018-05-15 发布日期:2018-05-25
  • 通讯作者: 任思潼
  • 作者简介:任思潼(1985-),女,辽宁沈阳人,东北大学博士研究生; 顾晓薇(1971-),女,辽宁凤城人,东北大学教授,博士生导师.
  • 基金资助:
    国家重点研发计划项目(2016YFC0801601,2016YFC0801604,2016YFC0801606);国家自然科学基金重点资助项目(51534003).

Mined-Out Area Treatment Method by Surface Filling Under Open-Pit Slope Adjacent to Tailing Reservoir

REN Si-tong1, GU Xiao-wei1, FU Yu1, LI Chuan-ying2   

  1. 1. School of Resources & Civil Engineering, Northeastern University, Shenyang 110819, China; 2. Liaoning Paishanlou Gold Mining Limited Liability Company, Fuxin 123000, China.
  • Received:2016-12-14 Revised:2016-12-14 Online:2018-05-15 Published:2018-05-25
  • Contact: FU Yu
  • About author:-
  • Supported by:
    -

摘要: 针对采空区废石充填常规处理方法难度大、费用高、安全性差等问题,结合排山楼金矿条件,研究了控制诱导冒落协同地表充填塌陷坑的采空区充填治理方法,包括采用RG井下电视监测评估空区冒落进程,从地表钻井充填保护露天坑尾矿库,崩落矿柱诱导空区冒透地表,地表充填塌陷坑恢复地貌,客土造田与恢复地表使用功能等方法.该方法用于排山楼金矿,使大型活动空区得到安全高效充填治理,取得了良好的技术经济效果.理论分析与实践表明,露天边帮下紧邻尾矿库的倾斜矿体采空区控制诱导冒落协同地表充填的治理方法,可减小采空区废石充填治理的难度,实现大型采空区安全高效治理.

关键词: 采空区治理, RG监测, 冒落边界控制, 诱导冒落, 地表充填

Abstract: Aimed at solving high cost, poor safety and extreme difficulty caused by conventional mined-out area treatment by waste rock filling, innovative mined-out area treatment method was studied by inducing and controlling caving as well as surface collapse pit filling, used in Paishanlou gold mine. The innovative methods including using of RG underground television monitoring and evaluation on mined-out area caving process, drilling from the surface protecting the open pit tailings reservoir, blasting ore pillar and inducing the emit through earth′s surface, recovering landform by filling collapse pit from the surface and land forming by alien earth and recovery surface function. The application of this innovative method in Paishanlou gold mine enables safe and efficient filling treatment of large-scale active mined-out area, and achieve good economical and technical results. Both theoretical analysis and practice shows that, for open-pit slope adjacent to the tailings reservoir of inclined ore body mined-out area, using controlled induced caving and surface filling method will reduce the difficulty of mined-out area waste rock filling treatment, and ensured safe and efficient treatment of large-scale mined-out area.

Key words: mined-out area treatment, RG monitoring, caving boundary control, induce caving, filling from surface