东北大学学报(自然科学版) ›› 2013, Vol. 34 ›› Issue (3): 429-432.DOI: -

• 资源与土木工程 • 上一篇    下一篇

煤层气藏地面勘探开发选区灰色模糊评价

陈天宇1,冯夏庭1,2,梁冰3,孙维吉3   

  1. (1.东北大学深部金属矿山安全开采教育部重点实验室,辽宁沈阳110819;2.中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖南武汉430071;3.辽宁工程技术大学力学与工程学院,辽宁阜新123000)
  • 收稿日期:2012-09-03 修回日期:2012-09-03 出版日期:2013-03-15 发布日期:2013-01-26
  • 通讯作者: 陈天宇
  • 作者简介:陈天宇(1986-),女,河南新乡人,东北大学博士研究生;冯夏庭(1964-),男,安徽潜山人,东北大学教授,博士生导师;梁冰(1962-),女,辽宁盘锦人,辽宁工程技术大学教授,博士生导师.
  • 基金资助:
    国家重点基础研究发展计划项目(2011CB201206);国家自然科学青年基金资助项目(50904033);辽宁省自然科学基金资助项目(20102090).

Grey Fuzzy Evaluation of CBM Development and Area Selection

CHEN Tianyu1, FENG Xiating1,2, LIANG Bing3, SUN Weiji3   

  1. 1. Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines, Northeastern University, Shenyang 110819, China; 2. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China; 3. School of Mechanics & Engineering, Liaoning Technical University, Fuxin 123000, China.
  • Received:2012-09-03 Revised:2012-09-03 Online:2013-03-15 Published:2013-01-26
  • Contact: CHEN Tianyu
  • About author:-
  • Supported by:
    -

摘要: 采用灰色关联分析方法确定了评价指标的权重,利用多级和梯形隶属度函数确定了指标的单因素评价,建立了煤层气资源地面开发选区模糊综合评价模型.利用Matlab编制了CBMES(coalbedmethaneevaluationsystem),对辽宁省7个主要煤田煤层气地面开发可行性进行了模糊综合评价.根据评价结果,各评价指标中煤层渗透率和含气量所占权重较大,其他指标权重由大到小依次为:煤层厚度、煤级、资源量、资源丰度、煤层压力、埋深.辽宁省各煤田煤层气开发可行性为:阜新煤田>铁法煤田>抚顺煤田>红阳煤田>沈北煤田>康平煤田>南票煤田,评价结果与实际开发情况吻合较好,证明了所建立模糊综合评价模型的合理性.

关键词: 煤层气, 地面开发, 选区, 灰色分析, 模糊综合评价

Abstract: The weights of evaluation indexes were confirmed by grey correlation analysis. Singlefactor fuzzy evaluation was determined by multistage and trapezoid membership function. Fuzzy comprehensive evaluation model for the feasibility study of CBM development was established. Based on the fuzzy comprehensive evaluation model CBMES (coal bed methane evaluation system) was developed by using Matlab, and it was employed to evaluate the CBM development feasibilities of seven main coalfields in Liaoning Province. According to the evaluation results, the weights of coal permeability and methane content are higher. Other indices, such as thickness of coal bed, coal rank, resource capacity, resources abundance, coal bed pressure, and burial depth are ranked in descending weight order. The feasibility of CBM development ranked in descending order is:Fuxin coal field, Tiefa coal field, Fushun coal field, Hongyang coal field, Shenbei coal field, Kangping coal field, and Nanpiao coal field. The results are in agreement with the in situ condition, which shows the rationality of fuzzy comprehensive evaluation model for the CBM development feasibility.

Key words: CBM(coal bed methane), ground development, area selection, grey analysis, fuzzy comprehensive evaluation

中图分类号: