Journal of Northeastern University(Natural Science) ›› 2021, Vol. 42 ›› Issue (7): 1025-1031.DOI: 10.12068/j.issn.1005-3026.2021.07.017

• Resources & Civil Engineering • Previous Articles     Next Articles

Experimental Study on Electric Heating of Tunnel Lining in Cold Region

WANG Lian-guang, XU Xiao, LI Xue   

  1. School of Resources & Civil Engineering, Northeastern University, Shenyang 110819, China.
  • Revised:2020-09-27 Accepted:2020-09-27 Published:2021-07-16
  • Contact: XU Xiao
  • About author:-
  • Supported by:
    -

Abstract: In winter, frost damage of tunnel such as lining damaged or even dripping and freezing often occurs in cold region. Therefore, the active heating system is necessary except for the insulation layer. The active heating system is mainly composed of the electric heating belt between the secondary lining and the insulation layer. In order to simulate the heating process of freezing-dripping-water tunnel lining, electric heating model tests on concrete specimen, including single specimen and triple test piece, was conducted from a negative temperature to a positive temperature. The results show that the surface temperature of the concrete specimen can be increased from -4℃ to over 0℃ within 60 minutes, if the electric heating belt with a length of 2 m, power of 30W, embedded depth of 10 mm and the polyurethane board with a thickness of 40mm are used as insulation layer. The research results can provide guidance for ice melting and antifreeze of tunnels in cold regions.

Key words: cold region tunnel; lining structure; electric heating system; temperature rising rule; experimental study

CLC Number: