KANG Yu-mei, LI Jia-qi, LIU Zi-ao, YU Jia-yue. Reliability Study of Prefabricated Box Culvert Components Based on Probability Density Evolution Method[J]. Journal of Northeastern University(Natural Science), 2021, 42(12): 1782-1789.
[1]Das S.Application of diagnostic load testing and 3D-FEA in load rating of RC box culverts[J].Bridge Structures—Assessment,Design and Construction,2013,9(4):155-167. [2]Peng Q,Jin D I,Feng J Q.Shear stress in the webs of single-box multi-cell composite box girders with corrugated steel webs [J].Engineering Mechanics,2017,34(7):97-107. [3]康玉梅,刘子傲,吴鹏飞.考虑荷载作用顺序的结构可靠度分析方法[J].东北大学学报(自然科学版),2019,40(11):1648-1653.(Kang Yu-mei,Liu Zi-ao,Wu Peng-fei.Structural reliability analysis method considering load sequence [J].Journal of Northeastern University(Natural Science), 2019,40(11):1648-1653.) [4]Nie J S,Ellingwood B R.Directional methods for structural reliability analysis [J].Structural Safety,2000,22:233-249. [5]Kleiber M,Hien T D.The stochastic finite element method:basic perturbation technique and computer implementation [M].New York:John Wiley & Sons,1992:198-235. [6]Ghanem R,Spanos P D.Polynomial chaos in stochastic finite elements [J].Journal of Applied Mechanics,1990,57(1):197-202. [7]Bhargava K,Mori Y,Ghosh A K.Time-dependent reliability of corrosion-affected RC beams.Part 1:Estimation of time-dependent strengths and associated variability[J].Nuclear Engineering and Design,2011,241(5):1371-1384. [8]唐小松,李典庆,曹子君,等.有限数据条件下边坡可靠度分析的Bootstrap方法[J].岩土力学,2016,37(3):893-911.(Tang Xiao-song,Li Dian-qing,Cao Zi-jun,et al.Bootstrap method for slope reliability analysis with limited data [J].Geotechnical Mechanics,2016,37(3):893-911.) [9]Chen X,Lind N C.Fast probability integration by three-parameter normal tail approximation[J].Structural Safety,1982,1(4):269-276. [10]Guo J,Zhao J,Zeng S.Structural reliability analysis based on analytical maximum entropy method using polynomial chaos expansion[J].Structural and Multidisciplinary Optimization, 2018,58(3):1187-1203. [11]Li J,Chen J B.Stochastic dynamics of structures[M].Singapore:John Wiley & Sons,2009:568-593. [12]Li J,Chen J B.The principle of preservation of probability and the generalized density evolution equation [J].Structural Safety,2008,30(1):65-77. [13]Chen J B,Chen J P.Error estimate of point selection in uncertainty quantification of nonlinear structures involving multiple nonuniformly distributed parameters[J].International Journal for Numerical Methods in Engineering,2019,118(9):536-560. [14]Li J,Yan Q,Chen J B.Stochastic modeling of engineering dynamic excitations for stochastic dynamics of structures[J].Probabilistic Engineering Mechanics,2012,27(1):19-28. [15]中交公路规划设计院.公路钢筋混凝土及预应力混凝土桥涵设计规范:JTG3362—2018[M].北京:人民交通出版社,2018:483-579.(Highway Planning and Design Institute.Code for design of highway reinforced concrete and prestressed concrete bridges and culverts:JTG3362—2018[M].Beijing:China Communications Publishing,2018:483-579.) [16]Li J,Chen J B.The number theoretical method in response analysis of nonlinear stochastic structures[J].Computer Mechanics, 2007,39(6):693-708. [17]Meng Z,Zhou H L,Hu H,et al.Enhanced sequential approximate programming using second order reliability method for accurate and efficient structural reliability-based design optimization[J].Applied Mathematical Modelling,2018,62(6):562-579. [18]王茜.开裂在役钢筋混凝土梁加卸载刚度与正常使用可靠度分析[D].成都:西南交通大学,2017.(Wang Xi.Analysis of loading and unloading stiffness and normal service reliability of cracked reinforced concrete beams in service[D].Chengdu:Southwest Jiaotong University,2017.)