Flexible job shop scheduling for decreasing production costs
Liu, Xiao-Xia (1); Xie, Li-Yang (1); Tao, Ze (2); Hao, Chang-Zhong (2)
Journal of Northeastern University . 2008, (4): 561 -564 .  DOI: -