Aircraft Part and Its Assembly Fixture Model Based on Multi-domain Integrated Mapping
XU Kai-yuan1, 2, QU Rong-xia1, WANG Jian-xi3
1. State Key Lab of Integrated Automation for Process Industry, Northeastern University, Shenyang 110819, China; 2. School of Mechanical Engineering & Automation, Northeastern University, Shenyang 110819, China; 3. Military Representative Office of PLA, Shenyang Liming Aero-Engine Co., Shenyang 110043, China.
XU Kai-yuan , QU Rong-xia, WANG Jian-xi. Aircraft Part and Its Assembly Fixture Model Based on Multi-domain Integrated Mapping[J]. Journal of Northeastern University Natural Science, 2015, 36(5): 704-708.
[1]Zhou Y B,Li Y.A feature-based fixture design methodology for the manufacturing of aircraft structural parts [J].Robotics and Computer-Integrated Manufacturing,2011,27(5):986-993. [2]张博,张洪涛,赵姗姗,等.基于多色集合理论的产品装配规划建模与算法研究[J].西安交通大学学报,2005,39(11):1254-1258.(Zhang Bo,Zhang Hong-tao,Zhao Shan-shan,et al.Product assembly planning modeling and algorithm based on polychromatic sets[J].Journal of Xian’an Jiaotong University,2005,39(11):1254-1258.) [3]Xu Z J,Li Y.A dynamic assembly model for assembly sequence planning of complex product based on polychromatic sets theory [J].Assembly Automation,2012,32(2):152-162. [4]Courvoisier V.Control of flexible production systems and Petri nets[J].Informatics,1982,66:264-267. [5]Peng G L,Wang G D.A desktop virtual reality-based interactive modular fixture configuration design system [J].Computer-Aided Design,2009,42(5):432-444. [6]Sudarsan R.A model for capturing product assembly information[J].Journal of Computing and Information Science in Engineering,2006,3(6):11-22. [7]Neng W,Zhan W.An intelligent fixture design method based on smart modular fixture unit[J].The International Journal of Advanced Manufacturing Technology,2013,69(12):2629-2649. [8]Papastathis M T N.Towards an intelligent fixturing system with rapid reconfiguration and part positioning [J].Journal of Materials Processing Technology,2008,2(1):198-203. [9]Wang H,Xiang D,Duan G H,et al.Assembly planning based on semantic modeling approach [J].Computers in Industry,2007,58(1):227-239. [10]徐开元,王成恩,张闻雷.基于多域集成设计的飞机装配资源模型[J].计算机集成制造系统,2014,20(2):351-360.(Xu Kai-yuan,Wang Cheng-en,Zhang Wen-lei,et al.Aircraft assembly resource kind and attribute model building based on multi-domain integrated design method [J].Computer Integrated Manufacturing Systems,2014,20(2):351-360.)