HUO Jun-zhou, CHEN Wei, OUYANG Xiang-yu, ZHANG Xu. Optimum Design of TBM Mucking Slot Based on the Rock Ballasts Fluidity[J]. Journal of Northeastern University Natural Science, 2015, 36(5): 715-718.
[1]钱七虎,李朝甫,傅德明.隧道掘进机在中国地下工程中应用现状及前景展望[J].地下空间,2002,22(1):1-11.(Qian Qi-hu,Li Chao-fu,Fu De-ming.The present and prospect of application of tunneler in China’s underground engineering[J].Underground Space,2002,22(1):1-11.) [2]Teale R.The concept of specific energy in rock drilling[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1965,2(1):57-73. [3]Ozdemir L,Wang F.Mechanical tunnel boring prediction and machine design(final report)[M].Colorado:Colorado School of Mines,1979. [4]Snowdon R A,Ryley M D,Temporal J.A study of disc cutting in selected British rocks[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1982,19(3):107-121. [5]Snowdon R A,Ryley M D.The effect of hydraulic stiffness on TBM performance[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1982,19(5):203-214. [6]Sanio H P.Prediction of the performance of disc cutters in anisotropic rock[J].International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1985,22(3):153-161. [7]Gertsch R,Ozdemir L.Performance prediction of mechanical excavators in Yucca Mountain Ruffs from linear cutting tests[R].Albuquerque:Sandia National Laboratories,SAND91-7038.1991:223-231. [8]Maidl B,Schmid L,Ritz W,et al.Hardrock tunnel boring machines[M].Berlin:Ernst & Sohn Verlag,2008:1-100. [9]虞诗强.TBM刀群与盘体支撑结构耦合布置设计方法[D].大连:大连理工大学,2013.(Yu Shi-qiang.The coupling design method of cutters group layout and mucking & supporting structure of full face rock TBM [D].Dalian:Dalian University of Technology,2013.) [10]Rostami J.Hard rock TBM cutterhead modeling for design and performance prediction[J].Geomechanics and Tunnelling,2008,1(1):18-28.