WANG Yun-sen, LI Yuan-hui, XU Shuai. Development of Three-Dimensional Dynamic Visualization System for Laneway Convergence Monitoring[J]. Journal of Northeastern University Natural Science, 2017, 38(1): 116-120.
[1]潘家旭.巷道收敛观测技术的发展与展望[J].采矿技术,2014,14(3):103-105,115.(Pan Jia-xu.Development and forecast of tunnel convergence monitoring technology[J].Mining Technology,2014,14(3):103-105,115.) [2]徐进军,王海城,罗喻真,等.基于三维激光扫描的滑坡变形监测与数据处理[J].岩土力学,2010,31(7):2188-2191,2196.(Xu Jin-jun,Wang Hai-cheng,Luo Yu-zhen,et al.Deformation monitoring and data processing of landslide based on 3D laser scanning[J].Rock and Soil Mechanics,2010,31(7):2188-2191,2196.) [3]谢雄耀,卢晓智,田海洋,等.基于地面三维激光扫描技术的隧道全断面变形测量方法[J].岩石力学与工程学报,2013,32(11):2214-2224.(Xie Xiong-yao,Lu Xiao-zhi,Tian Hai-yang,et al.Development of a modeling method for monitoring tunnel deformation based on terrestrial 3D laser scanning[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(11):2214-2224.) [4]荆洪迪,李元辉,张忠辉,等.基于三维激光扫描的岩体结构面信息提取[J].东北大学学报(自然科学版),2015,36(2):280-283.(Jing Hong-di,Li Yuan-hui,Zhang Zhong-hui,et al.Extraction of joint information of rock masses based on 3D laser scanning technology[J].Journal of Northeastern University(Natural Science),2015,36(2):280-283.) [5]Fardina N,Feng Q,Stephanssona O.Application of a new in situ 3D laser scanner to study the scale affection the rock joint surface[J].International Journal of Rock Mechanics & Mining Sciences,2004,41:329-335. [6]李占利,马巨鹏,王博辉.一种色彩渐进的矿井监测数据三维可视化方法[J].计算机工程,2012,38(20):212-214,223.(Li Zhan-li,Ma Ju-peng,Wang Bo-hui.A color gradual 3D visualization method for mine monitoring data[J].Computer Engineering,2012,38(20):212-214,223.) [7]Lavorante L P,Ebert H D.Tensor3D:a computer graphics program to simulate 3D real-time deformation and visualization of geometric bodies[J].Computers & Geosciences,2008,34(7):738-753. [8]Hsieh Y M,Lu Y S.Visualization system for field monitoring data and its effectiveness[J].Automation in Construction,2012,26:54-68. [9]Akula M,Lipman R R,Franaszek M,et al.Real-time drill monitoring and control using building information models augmented with 3D imaging data[J].Automation in Construction,2013,36:1-15.