Memetic Algorithm for Crane Scheduling Problem in Slab Yard with Spatial and Temporal Constraints
WANG Xu1, LIU Shi-xin1, WANG Jia2,3
1. School of Information Science & Engineering, Northeastern University, Shenyang 110819, China; 2. School of Business Administration, Northeastern University, Shenyang 110169, China;3.School of Economics, Northeastern University at Qinhuangdao, Qinhuangdao 066004,China.
WANG Xu, LIU Shi-xin, WANG Jia. Memetic Algorithm for Crane Scheduling Problem in Slab Yard with Spatial and Temporal Constraints[J]. Journal of Northeastern University Natural Science, 2017, 38(7): 913-917.
[1]Dohn A,Clausen J.Optimizing the slab yard planning and crane scheduling problem using a two-stage heuristic[J].International Journal of Production Research,2010,48(15):4585-4608. [2]Matsuo H,Shang J S,Sullivan R S.A crane scheduling problem in a computer-integrated manufacturing environment[J].Management Science,1991,37(5):587-606. [3]Kim K H,Park Y M.A crane scheduling method for port container terminals[J].European Journal of Operation Research,2004,156(3):752-768. [4]Jung S H,Kim K H.Load scheduling for multiple quay cranes in port container terminals[J].Journal of Intelligent Manufacturing,2006,17(4):479-492. [5]Tamaki H,Murao H.Simulation-based optimization model and meta heuristic solution of multiple crane scheduling problem[C]// IEEE International Conference on Systems,Man and Cybernetic.Shanghai,2004:1469-1472. [6]Liu P,Tang L X.The refining scheduling problem with crane non-collision constraint in steelmaking process[C]// IEEE International Conference on Automation and Logistics.Qingdao,2008:536-541. [7]赵宁,杜彦华,董绍华.基于循环仿真的钢铁板坯库天车作业优化[J].系统工程理论与实践,2012,32(12):2925-2830.(Zhao Ning,Du Yan-hua,Dong Shao-hua.Optimization of crane scheduling in slab yard based on cycle simulation[J].Systems Engineering—Theory & Practice,2012,32(12):2925-2830.) [8]王旭,刘士新,王佳.求解具有时空约束的天车调度问题Memetic算法[J].东北大学学报(自然科学版),2014,35(2):191-194.(Wang Xu,Liu Shi-xin,Wang Jia.Memetic algorithm for crane scheduling problem with spatial and temporal constraints[J]. Journal of Northeastern University(Natural Science),2014,35(2):191-194.) [9]Tang L X,Xie X.Scheduling of a single in batch annealing process[J].Computers and Operation Research,2009,36(10):2835-2865. [10]Tanizaki T,Tamura T,Sakai H.A heuristic scheduling algorithm for steel making process with crane handling[J]. Journal of the Operations Research Society of Japan,2006,49(3):188-201.