WANG Qing, GU Xiao-wei, XU Xiao-chuan. Influence of Cutoff Grade on Optimum Pit Limit and Total Profit[J]. Journal of Northeastern University Natural Science, 2018, 39(8): 1187-1191.
[1]Frimpong S,Asa E,Szymanski J.Intelligent modeling:advances in open pit mine design and optimization research [J].International Journal of Surface Mining,Reclamation and Environment,2002,16(2):134-143. [2]Jalali S E,Ataee-Pour M,Shahriar K.Pit limits optimization using a stochastic process[J].CIM Magazine,2006,1(6):90-94. [3]Lane K F.Choosing the optimum cutoff grade [J].Quarterly of the Colorado School of Mines,1964,59:811-829. [4]Lane K F.Commercial aspects of choosing cutoff grades [C]//Proceedings of the 16th International Symposium on Applications of Computers and Operations Research in the Mineral Industry(APCOM).Littleton,1979:280-285. [5]Asad M W.Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals [J]. International Journal of Surface Mining,Reclamation and Environment,2005,19(3):176-187. [6]Bascetin A,Nieto A.Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor [J].Journal of the Southern African Institute of Mining and Metallurgy,2007,107(2):87-94. [7]Osanloo M,Rashidinejad F,Rezai B.Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits[J]. Resources Policy,2008,33(4):222-229. [8]Wang Q,Gu X,Chu D.A dynamic optimization method for determining cutoff grades in underground mines [C]//Proceedings of the 21st World Mining Congress.Kraków,Poland,2008:133-142.