ZHOU Bing-hai, WANG Ke. Column Generation Scheduling Algorithm of Reentrant Hybrid Flow Shops(RHFS) with Queue Constraints[J]. Journal of Northeastern University Natural Science, 2018, 39(9): 1315-1320.
[1]Zhou B,Gao Z,Chen J.Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints[J].Journal of Central South University,2014,21(1):160-166. [2]周炳海,石潇铭.带重入约束的双集束型晶圆制造设备调度算法[J].东北大学学报(自然科学版),2013,34(9):1305-1309.(Zhou Bing-hai,Shi Xiao-ming.Scheduling algorithm for double-cluster of wafer fabrication system with reentrant constraints[J].Journal of Northeastern University(Natural Science),2013,34(9):1305-1309.) [3]Graves S C,Meal H C,Stefek D,et al.Scheduling of re-entrant flow shops[J].Journal of Operations Management,1983,3(4):197-207. [4]Hekmatfar M,Ghomi S M T F,Karimi B.Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan[J].Applied Soft Computing,2011,11(8):4530-4539. [5]Dugardin F,Yalaoui F,Amodeo L.New multi-objective method to solve reentrant hybrid flow shop scheduling problem[J].European Journal of Operational Research,2010,203(1):22-31. [6]Cho H M,Bae S J,Kim J,et al.Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm[J].Computers & Industrial Engineering,2011,61(3):529-541. [7]Jeong B,Kim Y D.Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times[J].Computers & Operations Research,2014,47(47):72-80. [8]Choi H S,Kim H W,Lee D H,et al.Scheduling algorithms for two-stage reentrant hybrid flow shops:minimizing makespan under the maximum allowable due dates[J].International Journal of Advanced Manufacturing Technology,2009,42(9/10):963-973. [9]Wu K,Zhao N,Gao L,et al.Production control policy for tandem workstations with constant service times and queue time constraints[J].International Journal of Production Research,2016,54(21):6302-6316. [10]Wu K.Classification of queueing models for a workstation with interruptions:a review[J].International Journal of Production Research,2014,52(3):902-917. [11]An Y J,Kim Y D,Choi S W.Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times[J].Computers & Operations Research,2016,71(1):127-136. [12]Nishi T,Izuno T.Column generation heuristics for ship routing and scheduling problems in crude oil transportation with split deliveries[J].Computers & Chemical Engineering,2014,60(2):329-338. [13]Tas D,Gendreau M,Dellaert N,et al.Vehicle routing with soft time windows and stochastic travel times:a column generation and branch-and-price solution approach[J].European Journal of Operational Research,2014,236(3):789-799.(上接第1265页) [7]Baker A R,Greenaway A M,Ingram C W.A microwave digestion-based determination of low molecular weight organic acids in Bayer process liquor [J].Talanta,1995,42(10):1355-1360. [8]Power G,Loh J S C,Vernon C.Organic compounds in the processing of lateritic bauxites to alumina:part 2:effects of organics in the Bayer process [J].Hydrometallurgy,2012,127/128:125-149. [9]Pan X L,Yu H Y,Tu G F,et al.Effects of precipitation activity of desilication products (DSPs) on stability of sodium aluminate solution [J].Hydrometallurgy,2016,165:261-269. [10]潘晓林,蒋涛,侯宪林,等.拜耳法过程水合铝硅酸钠析出活性研究 [J].中国有色金属学报,2017,27(8):1748-1755.(Pan Xiao-lin,Jiang Tao,Hou Xian-lin,et al.Precipitation activity of sodium aluminosilicate hydrate during the Bayer process [J].The Chinese Journal of Nonferrous Metals,2017,27(8):1748-1755.)