ZHOU Bing-hai, LIU Yu-wang. Production System Maintenance Decision Models Based on Product Quality and Rework Process[J]. Journal of Northeastern University Natural Science, 2017, 38(9): 1315-1321.
[1]Li J S,Dennis E B,Huang N J,et al.Throughput analysis of production systems:recent advances and future topics[J].International Journal of Production Research,2009,47(14):3823-3851. [2]Biller S,Marin S P,Meerkov S M,et al.Closed production lines with arbitrary models of machine reliability[C]//IEEE International Conference on Automation Science and Engineering.Washington D C,2008:466-471. [3]Biller S,Marin S P,Meerkov S M,et al.Closed bernoulli production lines:analysis,continuous improvement,and leanness[J].IEEE Transactions on Automation Science and Engineering,2009,6(1):168-180. [4]Savsar M.Modeling of hybrid production systems with constant WIP and unreliable equipment[J].International Journal of Information Systems & Supply Chain Management,2011,4(4):46-66. [5]Kim J,Gershwin S B.Integrated quality and quantity modeling of a production line[J].Operations Research Spectrum,2005,27(2/3):287-314. [6]Colledani M,Tolio T.Integrated analysis of quality and production logistics performance in manufacturing lines[J].International Journal of Production Research,2011,49(2):485-518. [7]Radhoui M,Rezg N,Chelbi A.Joint quality control and preventive maintenance strategy for imperfect production processes[J].Journal of Intelligent Manufacturing,2010,21(2):205-212. [8]Mhada F,Hajji A,Malhamé R,et al.Production control of unreliable manufacturing systems producing defective items[J].Journal of Quality in Maintenance Engineering,2011,17(3):238-253. [9]Ruifeng C,Subramaniam V.Increasing production rate in Kanban controlled assembly lines through preventive maintenance[J].International Journal of Production Research,2012,50(4):991-1008. [10]Xia B X,Xi L F,Zhou B H.An improved decomposition method for evaluating the performance of transfer lines with unreliable machines and finite buffers[J].International Journal of Production Research,2011,50(15):1-16. [11]Li Y,Chang Q,Xiao G,et al.Data-driven analysis of downtime impacts in parallel production systems[J].IEEE Transactions on Automation Science and Engineering,2015,12(4):1541-1547. [12]Wang L,Chen F.An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem[J].Computers & Operations Research,2012,39(2):449-460. [13]Kenndy J,Eberhart R C.Particle swarm optimization[C]//Proceedings of IEEE International Conference on Neural Networks.Perth,1995:1942-1948.