CAO Wen-xin, ZHAO Wen, LU Bo, JIA Peng-jiao. Optimization of Connection Parameters of Steel Tube Slab Structures Based on Fuzzy Mathematics[J]. Journal of Northeastern University(Natural Science), 2022, 43(2): 258-266.
[1]Guan Y P,Zhao W,Li S G,et al.Key techniques and risk management for the application of the pile-beam-arch(PBA)excavation method:a case study of the Zhongjie subway station[J/OL].The Scientific World Journal,2014 [2021-04-18].http://dx.doi.org/10.1155/2014/275362,2014,4.DOI:10.1155/2014/275362. [2]Yu Q Z,Ding L Y,Zhou C,et al.Analysis of factors influencing safety management for metro construction in China [J].Accident Analysis & Prevention,2014,68:131-138. [3]Coller P J,Abbott D G.Microtunneling techniques to form an in situ barrier around existing structures[C/OL]// High Level Radioactive Waste Management 1994.Las Vegas,1994[2021-04-10].https://cedb.asce.org/CEDBsearch/record.jsp?dockey=0087952. [4]Kaneke M,Sibata Y,Katou K.The construction of large section tunnel under highway using FJ method in Oosawa Narita Line[J].Civil Construction,2003,41:2-9. [5]Bito Y.Construction methods of the structures passing through under railway lines[J].Japanese Railway Engineering,1987,4:6-9. [6]Musso G.Jacked pipe provides roof for underground construction in busy urban area[J].Civil Engineering,1979,49:79-82. [7]Darling P.Jacking fibreglass in New York[J/OL].[2021-04-16].https://www.researchgate.net/publication/295532607_Jacking_fibreglass_in_New_York. [8]Darling P.Jacking under Singapore’s busiest street[J/OL].[2021-04-16].https://www.researchgate.net/publication/295520304_Jacking_under_Singapore′s_busiest_street. [9]Schumacher F P,Kim E.Modeling the pipe umbrella roof support system in a Western US underground coal mine[J].International Journal of Rock Mechanics and Mining Sciences,2013,60:114-124. [10]Rhodes G W,Kauschinger J L.Microtunnelling provides structural support for large tunnels with shallow cover[M]// North American Tunneling.Rotterdam:A.A.Balkema,1996:443-449. [11]贾鹏蛟.地下STS管幕结构的破坏机制及横纵向抗弯性能研究[D].沈阳:东北大学,2020.(Jia Peng-jiao.Study on failure mechanism and transversal-longitudinal flexural behavior of underground steel tube slab (STS) structure[D].Shenyang:Northeastern University,2020.) [12]Xiao H J,Zhou S H,Sun Y Y.Stability analysis and case study of shallow tunnel using pipe roof support[J].Geotechnical and Geological Engineering,2019,37:1249-1260. [13]赵文,贾鹏蛟,王连广,等.地铁车站STS新管幕构件抗弯承载力试验研究[J].工程力学,2016,33(8):167-176.(Zhao Wen,Jia Peng-jiao,Wang Lian-guang,et al.Experimental study on the flexural capacity of steel tube slab members of subway station[J].Engineering Mechanics,2016,33(8):167-176.) [14]关永平,赵文,王连广,等.STS管幕结构抗弯性能试验研究及参数优化[J].工程力学,2017,34(9):83-91.(Guan Yong-ping,Zhao Wen,Wang Lian-guang,et al.Study on parameter optimization and the flexural behavior of steel tube slab structure[J].Engineering Mechanics,2017,34(9):83-91.) [15]贾鹏蛟,赵文,郝云超,等.不同结构参数下STS管幕构件力学性能的数值分析[J].东北大学学报(自然科学版),2016,37(8):1177-1181.(Jia Peng-jiao,Zhao Wen,Hao Yun-chao,et al.Numerical analysis of the mechanical properties of steel tube slab component under different structural parameters[J].Journal of Northeastern University(Natural Science),2016,37(8):1177-1181.) [16]Jia P J,Zhao W,Guan Y P,et al.Experimental study on the flexural behavior of steel tube slab composite beams and key parameters optimization[J].Advances in Structural Engineering,2019,22(11):2476-2489. [17]Jia P J,Zhao W,Du X,et al.Study on ground settlement and structural deformation for large span subway station using a new pre-supporting system[J].Royal Society Open Science,2019,6(2):181035. [18]Jia P J,Jiang B F,Zhao W,et al.Calculating jacking forces for circular pipes with welding flange slabs from a combined theory and case study[J].KSCE Journal of Civil Engineering,2019,23:1586-1599. [19]Zhang C,Zhao W,Liu S,et al.Experimental investigation of the flexural mechanism and performance of channel steel tube slab structure under concentrated loads[J].Advances in Structural Engineering,2020,23(11):2471-2485.