Journal of Northeastern University ›› 2005, Vol. 26 ›› Issue (11): 16-18.DOI: -

• OriginalPaper • Previous Articles     Next Articles

LMP calculation on PJM power market and its trial in China

Zhang, Rui-You (1); Han, Shui (2); Zhang, Jin-Zhu (3); Wang, Ding-Wei (1)   

  1. (1) School of Information Science and Engineering, Northeastern University, Shenyang 110004, China; (2) Northeast China Bureau, State Electricity Regulatory Commission of China, Shenyang 110006, China; (3) Northeastern Electric Power Research Institute, Shenyang 110006, China
  • Received:2013-06-24 Revised:2013-06-24 Online:2005-11-15 Published:2013-06-24
  • Contact: Zhang, R.-Y.
  • About author:-
  • Supported by:
    -

Abstract: For the pricing of power transmission/distribution in China, the PJM power market is introduced as a reference and studied, in which the locational marginal price (LMP) with no transmission loss taken into account is calculated according to the security constrained economic dispatch (SCED) based on de-power flow. To adapt the actual need, the constraints on the sum of transmitted power of multiple branches are added to the original PJM model, and the power transmission distributed factor (PTDF) matrix is proposed for branch sets. To test the efficiency of the proposed approach, a calculation trial has been done using a mathematical model of a 500 kV network. The results showed that the approach can provide correct signals to all parties on power market and manage well the costs due to congestion with the fixed transmission right (FTR) used together.

CLC Number: