GUO Xiwang, LIU Shixin. Optimization Model and Algorithm for Solving LotSizing Disassembly with Multiresource Constraint[J]. Journal of Northeastern University, 2013, 34(10): 1387-1390.
[1] Wang H,Xiang D,Duan G H.A genetic algorithm for product disassembly sequence planning[J].Neurocomputing,2008,71(3):2720/2726. [2] Min S S,Zhu X J,Zhu X.Mechanical product disassembly and/or graph construction[C]//IEEE International Conference on Measuring Technology and Mechatronics Automation.Wuhan,2010:627/631. [3] Lee D H,Kang J G,Xirouchakis P.Disassembly planning and scheduling:review and further research[J].Journal of Engineering Manufacturing B,2001,215(5):695/709. [4] Kim H J,Lee D H,Xirouchakis P,et al.Disassembly scheduling with multiple product types[J].Annals Manufacturing Technology,2003,52(1):403/406. [5] Gao N,Chen W D.A genetic algorithm for disassembly scheduling with assembly product structure[C]//Proceedings of 2008 IEEE International Conference on Service Operations and Logistics,and Informatics.Beijing,2008:2238/2243. [6] Kim H J,Lee D H,Xirouchakis P.A branch and bound algorithm for disassembly scheduling with assembly product structure[J].Operations Research Society,2006,60(3):419/430. [7] Kim H J,Lee D H,Xirouchakis P.A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints[J].Journal of the Operations Research Society,2006,57(10):1231/1240. [8] Kim H J,Lee D H,Xirouchakis P.Two phase heuristic for disassembly scheduling with multiple product types and parts commonality[J].International Journal of Production Research,2006,44(1):195/212. [9] Lee D H,Kim H J,Xirouchakis P.Disassembly scheduling:integer programming models[J].Institute Machine Engineering B:Journal of Engineering Manufacture,2004,38:1357/1372.