[1] Liu F H,Hung P C.Control strategy for dispatching multi load automated guided vehicles in a deadlockfree environment[J].Journal of Mathematical Modelling and Algorithms,2002,1(2):117/134. [2] Xiao H N,Lou P H,Man Z G,et al.Realtime multiattribute dispatching method for automatic guided vehicle system[J].Computer Integrated Manufacturing Systems,2012,8(10):2224/2230. [3] Morandin O Jr,Kato E R R,Tuma C C M.A strategy of production scheduling with the fitness function of genetic algorithm using timed Petri net and considering AGV and the input buffer[C]// 36th Annual Conference of the IEEE Industrial Electronics Society.Glendale:IEEE,2010:1311/1316. [4] Kalinovcic L,Petrovic T,Bogdan S,et al.Modified Banker’s algorithm for scheduling in multiAGV systems[C]// IEEE International Conference on Automation Science and Engineering.Trieste:IEEE,2011:351/356. [5] Lawley M,Reveliotis S.Deadlock avoidance for sequential resource allocation systems:hard and easy cases[J].International Journal of Flexible Manufacturing Systems,2001,13(4):385/404. [6] Wu N Q,Zhou M C.Resourceoriented Petri net for deadlock resolution in automated manufacturing systems with robots[C]// Proceedings of the 2006 IEEE International Conference on Systems,Man,and Cybernetics.Taipei:IEEE,2006:74/79. [7] Lochana M R,Wee H G,Ng W C,et al.Cyclic deadlock prediction and avoidance for zonecontrolled AGV system[J].International Journal of Production Economics,2003,83(3):309/324. [8] Miyamoto T,Tsujimoto N,Kumagai S.A cooperative algorithm for autonomous distributed vehicle systems with finite buffer capacity[J].IEICE Transactions on Fundamentals of Electronics,Communications and Computer Sciences,2005,E88/A(11):3036/3044. [9] Reveliotis S A.Analytical investigation of the deadlock avoidance versus detection and recovery problem in bufferspace allocation of flexibly automated production systems[J].IEEE Transactions on Systems,Man,and Cybernetics,Part B:Cybernetics,2000,30(5):799/811.