ZHAO Wen, HAN Li, GUAN Yong-ping, LI Shen-gang. Risk Analysis of Existing Buildings During Excavation of Metro Station Using Shallow Tunneling Method[J]. Journal of Northeastern University:Natural Science, 2013, 34(1): 140-143.
[1]Casagrande A.The role of ‘calculeted risk’ in earthwork and foundation engineering[J].Journal of Soil Mechanical.Devision,ASCE,1965,91(4):1-40. [2]Burland J B.Measurement of ground displacement around deep excavation[C]//Symposiums on field Instrument in geotechnical engineering.London:Halsted Press,1974:70-84. [3]You K,Park Y,Lee J S.Risk analysis for determination of a tunnel support pattern[J].Tunneling and Underground Space Technology,2005,20:479-486. [4]边亦海.基于风险分析的软土地区深基坑支护方案选择[D].上海:同济大学,2006.(Bian Yi-hai.Design of support scheme in soft soil zone based on the risk analysis[D].Shanghai:Tongji University,2006.) [5]Minott C H.The probabilistic estimation of construction performance in hard rock tunnels[R].Washington:National Science Foundation,Research Applied to National Needs(RANN) Program,1974. [6]Einstein H H.Tunnelling in difficult ground-swelling behavior and identification of swelling rocks[J].Rock Mechanics and Rock Engineering,1996,27(3):113-124. [7]Einstein H H.Risk and risk analysis in rock engineering[J].Tunneling and Underground Space Technology,1996,11(2):141-155. [8]房倩,张顶立,侯永兵,等.浅埋暗挖地铁车站的安全风险控制技术[J].北京交通大学学报,2010,34(4):16-21.(Fang Qian,Zhang Ding-li,Hou Yong-bing,et al.Safety risk control technology of urban subway with shallow tunnel construction method[J].Journal of Beijing Jiaotong University,2010,34(4):16-21.) [9]Fang Q,Zhang D I,Wong L N Y.Environmental risk management for a cross interchange subway station construction in China[J].Tunnelling and Underground Space Technology,2011,26:750-763. [10]王晶,谭跃虎,王鹏飞,等.地铁隧道施工过程中风险分析与控制[J].解放军理工大学学报,2009,10(4):379-383.(Wang Jing,Tan Yue-hu,Wang Peng-fei,et al.Risk assessment on subway tunnel engineering during construction process[J].Journal of PLA University of Science and Technology,2009,10(4):379-383.)