Memetic Algorithm for Crane Scheduling Problem with Spatial and Temporal Constraints
WANG Xu1,2, LIU Shixin1,2, WANG Jia3
1. School of Information Science & Engineering, Northeastern University, Shenyang 110819, China; 2. State Key Laboratory of Synthetical Automation for Process Industries, Northeastern University, Shenyang 110819, China; 3. School of Business Administration, Northeastern University, Shenyang 110819, China.
WANG Xu, LIU Shixin, WANG Jia. Memetic Algorithm for Crane Scheduling Problem with Spatial and Temporal Constraints[J]. Journal of Northeastern University Natural Science, 2014, 35(2): 190-194.
[1] 王书锋,周益仁.车间作业调度(JSSP)技术问题简明综述[J].系统工程理论与实践,2003,23(1):49/55.(Wang Shufeng,Zhou Yiren.Techniques for the job shop scheduling problem:a survey[J].Systems Engineering—Theory & Practice,2003,23(1):49/55.) [2] Tamaki H,Kitamura S,Murao H.Simulationbased optimization model and metaheuristic solution of multiple crane scheduling problem[C]//IEEE International Conference on Systems,Man and Cybernetic.Hague,2004:1469/1472. [3] Tanizaki T,Tamura T,Sakai H,et al.A heuristic scheduling algorithm for steel making process with crane handling[J].Journal of the Operation Research Society of Japan,2006,49(3):188/201. [4] Ge Y,Yin Y.Crane scheduling with time windows in circuit board production lines[J].International Journal of Production Research,1995,33(5):1187/1199. [5] 刘青,田乃媛,王英群.天车调度在优化钢厂物流管制中的重要作用[J].北京科技大学学报,1998,20(1):36/40.(Liu Qing,Tian Naiyuan,Wang Yingqun.Important role of crane schedule in optimizing mass flow control of steel plant[J].Journal of University of Science and Technology Beijing,1998,20(1):36/40.) [6] Tang L X,Xie X,Liu J Y.Scheduling of a single crane in batch annealing process[J].Computer & Operations Research,2009,36(10):2853/2865. [7] Aron I D,GencKaya L,Harjunkoski I,et al.Factory crane scheduling by dynamic programming[C]// Operations Research,Computing and Homeland Defense.Monterey,2011:93/107.