ZENG Cheng-kuan, LIU Shi-xin. Job Shop Scheduling Problem with Limited Output Buffer[J]. Journal of Northeastern University Natural Science, 2018, 39(12): 1679-1684.
[1]Brucker P,Heitmann S,Hurink J,et al.Job-shop scheduling with limited capacity buffers[J].OR Spectrum,2006,28(2):151-176. [2]Lacomme P,Larabi M,Tchernev N.Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles[J].International Journal of Production Economics,2013,143(1):24-34. [3]Hsieh Y C,You P S,Liou C D.A note of using effective immune based approach for the flow shop scheduling with buffers[J].Applied Mathematics and Computation,2009,215(5):1984-1989. [4]Pan Q K,Wang L,Gao L.A chaotic harmony search algorithm for the flow shop scheduling problem with limited buffers[J].Applied Soft Computing,2011,11(8):5270-5280. [5]Pan Q K,Wang L,Gao L,et al.An effective hybrid discrete differential evolution algorithm for the flow shop scheduling with intermediate buffers[J].Information Sciences,2011,181(3):668-685. [6]Wang L,Zhang L,Zheng D Z.An effective hybrid genetic algorithm for flow shop scheduling with limited buffers[J].Computers & Operations Research,2006,33(10):2960-2971. [7]Xie Z P,Zhang C Y,Shao X Y,et al.Flow shop scheduling with limited buffers based on memetic algorithm [J].Computer Integrated Manufacturing Systems,2015,21(5):1253-1261. [8]Pan Q K,Tasgetiren M F,Suganthan P N,et al.A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem [J].Information Sciences,2011,181(12):2455-2468. [9]Zhang C,Shi Z S,Huang Z W,et al.Flow shop scheduling with a batch processor and limited buffer[J].International Journal of Production Research,2017,55(11):3217-3233. [10]Nawaz M,Enscore E E J,Ham I.A heuristic algorithm for the m-machine,n-job flow shop sequencing problem[J].Omega-International Journal of Management Science,1983,11(1):91-95. [11]Zeng C K,Tang J F,Yan C J.Job-shop cell-scheduling problem with inter-cell moves and automated guided vehicles[J].Journal of Intelligent Manufacturing,2015,26(5):845-859. [12]Lawrence S.Supplement to resource constrained project scheduling:an experimental investigation of heuristic scheduling techniques[R].Pittsburgh:Carnegie Mellon University,1984. [13]Grflin H,Klinkert A.A new neighborhood and tabu search for the blocking job shop[J].Discrete Applied Mathematics,2009,157(17):3643-3655.