ZHOU Bing-hai, ZHOU Shu-mei, ZHAO Meng. Disjunctive Graph-Based Scheduling Algorithm for Job Shop with Material Handling[J]. Journal of Northeastern University Natural Science, 2016, 37(1): 138-142.
[1]Schutten J M J.Practical job shop scheduling[J].Annals of Operations Research,1998,83(2):161-178. [2]Hurink J,Knust S.Tabu search algorithms for job-shop problems with a single transport robot[J].European Journal of Operational Research,2005,162(1):99-111. [3]何之洲,杨煜俊,陈新度.带搬运机器人的 job-shop 问题的并行禁忌搜索算法[J].工业工程,2013,16(4):122-125.(He Zhi-zhou,Yang Yu-jun,Chen Xin-du.Parallel tabu search scheduling algorithm for job-shop with transport robot[J].Industrial Engineering Journal,2013,16(4):122-125.) [4]晏鹏宇,车阿大,李鹏,等.具有柔性加工时间的机器人制造单元调度问题改进遗传算法[J].计算机集成制造系统,2010,16(2):404-410.(Yan Peng-yu,Che A-da,Li Peng,et al.Improved genetic algorithm for robotic cell scheduling problem with flexible processing time [J].Computer Integrated Manufacturing Systems,2010,16(2):404-410.) [5]Blazewicz J,Pesch E,Sterna M.Application of a modified disjunctive graph for the job shop scheduling problem [C] //Proceedings of the Fourth International Symposium on Methods and Models in Automation and Robotics.Miewdzyzdroje,1997:935-940. [6]Lacomme P,Larabi M,Tchernev N.Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles[J].International Journal of Production Economics,2013,143(1):24-34. [7]Deroussi L,Gourgand M,Tchernev N.A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles[J].International Journal of Production Research,2008,46(8):2143-2164. [8]Zhang Q,Manier H,Manier M A.A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing time[J].Computers & Operations Research,2012,39(7):1713-1723. [9]Driessel R,Mnch L.An integrated scheduling and material-handling approach for complex job shops:a computational study[J].International Journal of Production Research,2012,50(20):5966-5985.(上接第126页)二次抛物线增长关系.而冻结尾矿的变形模量与平均粒径呈自然对数关系,同样与干密度亦呈指数函数关系,与含水率则呈二次抛物线关系,与加载速率呈指数函数增长关系.