LI Ji, XU An-jun. Simulation-based Solution for Multi-crane Dynamic Scheduling in Steelmaking Shop[J]. Journal of Northeastern University Natural Science, 2020, 41(12): 1699-1707.
[1]Boysen N,Briskorn D,Meisel F.A generalized classification scheme for crane scheduling with interference[J].European Journal of Operational Research,2017,258(1):343-357. [2]Bierwirth C,Meisel F.A follow-up survey of berth allocation and quay crane scheduling problems in container terminals[J].European Journal of Operational Research,2015,244(3):675-689. [3]Peterson B,Harjunkoski I,Hoda S,et al.Scheduling multiple factory cranes on a common track[J].Computers & Operations Research,2014,48(8):102-112. [4]Cheng X,Tang L X,Pardalos P M.A Branch-and-Cut algorithm for factory crane scheduling problem[J].Journal of Global Optimization,2015,63(4):729-755. [5]王旭,刘士新,王佳.求解具有时空约束的天车调度问题Memetic算法[J].东北大学学报(自然科学版),2014,35(2):190-194.(Wang Xu,Liu Shi-xin,Wang Jia.Memetic algorithm for crane scheduling problem with spatial and temporal constraints[J].Journal of Northeastern University (Natural Science),2014,35(2):190-194.) [6]高小强,李盼,龙建宇,等.时空约束下连铸车间天车调度的多目标建模与求解[J].系统工程理论与实践,2017,37(9):2373-2383.(Gao Xiao-qiang,Li Pan,Long Jian-yu,et al.Multi-objective modelling and solving for crane scheduling with spatio-temporal constraints in casting workshop[J].Systems Engineering — Theory & Practice,2017,37(9):2373-2383.) [7]Xie X,Zheng Y Y,Tang L X,et al.Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading[J].Applied Mathematical Modelling,2017,49:470-486. [8]Hirsch P,Palfi A,Gronal T M.Solving a time constrained two-crane routing problem for material handling with an ant colony optimisation approach:an application in the roof-tile industry[J].International Journal of Production Research,2012,50(20):6005-6021. [9]周炳海,廖秀梅.基于轨迹映射模型的天车多目标调度方法[J].湖南大学学报(自然科学版),2019,46(4):10-16.(Zhou Bing-hai,Liao Xiu-mei.Multi-objective scheduling method for workshop cranes based on projection model of trajectories[J].Journal of Hunan University (Natural Sciences),2019,46(4):10-16.) [10]Kung Y,Kobayashi Y,Higashi T,et al.Order scheduling of multiple stacker cranes on common rails in an automated storage/retrieval system[J].International Journal of Production Research,2014,52(4):1171-1187. [11]李维刚,王肖,赵云涛,等.基于栅格法的钢厂无人天车调度系统[J].系统仿真学报,2020,32(4):687-699.(Li Wei-gang,Wang Xiao,Zhao Yun-tao,et al.Unmanned crane dispatching system based on grid method in steel works[J].Journal of System Simulation,2020,32(4):687-699.) [12]Yin R Y.Theory and method of metallurgical process integration[M].New York:Academic Press,2013. [13]Lim A,Rodrigues B,Xu Z.A m-parallel crane scheduling problem with a non-crossing constraint[J].Naval Research Logistics,2007,54(2):115-127.