[1] Crawford J T,Hustrulid W A.Open pit mine planning and design[M].[S.l]:SME/AIME,1979. [2] Dowd P A,OnurA H.Openpit optimizationpart1:optimal openpit design[J].Transactions of The Institution of Mining and MetalLurgy,1993,102:95/104. [3] Lerchs H,Grossmann I.Optimum design of openpit mines[J].Canadian Institute of Mining,Metallurgy and Petroleum Bulletin,1965,58(1):17/24. [4] Rafael E,Marcel G,Andrés W,et al.Optimizing longterm production plans in underground and openpit copper mines[J].Operations Research,2012,60(1):4/17. [5] 李德,曾庆田,吴东旭,等.基于三维可视化技术的露天境界优化研究[J].金属矿山,2008(4):103/108.(Li De,Zeng Qingtian,Wu Dongxu,et al.Study on technology of 3D visualization based open pit limit optimization[J].Metal Mine,2008(4):103/108.) [6] Kim Y C.Ultimate pit limit design methodologies using computer models:the state of the art[J].Mining Engineering,1978,10:1454/1459. [7] 王青,任凤玉,顾晓薇,等.采矿学[M].2版.北京:冶金工业出版社,2011:357.(Wang Qing,Ren Fengyu,Gu Xiaowei,et al.Mining science[M].2nd ed.Beijing:Metallurgical Industry Press,2011:357.) [8] Gu X W,Wang Q,Chu D Z,et al.Dynamic optimization of cut off grade in underground metal mining[J].Journal of Central South University of Technology,2010,17(3):492/497. [9] Gu X W,Wang Q,Ge S.Dynamic phasemining optimization in openpit metal mines[J].Transactions of Nonferrous Metals Society of China,2010,20(10):1974/1980.