EconomicEcological Integration Optimization of the Ultimate Boundary of Metal OpenPit Mine
GU Xiaowei1, XU Xiaochuan1, WANG Qing1, LIU Jianping1,2
1. School of Resources & Civil Engineering, Northeastern University, Shenyang 110819, China; 2. Dongmei Foundation Company of Shenyang, Shenyang 110016, China.
GU Xiaowei, XU Xiaochuan, WANG Qing, LIU Jianping. EconomicEcological Integration Optimization of the Ultimate Boundary of Metal OpenPit Mine[J]. Journal of Northeastern University, 2013, 34(9): 1347-1350.
[1] Lemieux M J.Moving cone optimizing algorithm[C]//Computer Methods for the 80’s in the Mineral Industry.New York:SMEAIME,1979:329/345. [2] Lerchs H,Grossmann I F.Optimum design of open pit mines[J].Canadian Institute of Mining Bulletin,1965,58(633):47/54. [3] Dimitrakopoulos R,Martinez L,Ramazan S.A maximum upside/minimum downside approach to the traditional optimization of open pit mine design[J].Journal of Mining Science,2007,43(1):73/82. [4] Jalali S E,AtaeePour M,Shahriar K.Pit limits optimization using a stochastic process[J].Canadian Institute of Mining Magazine,2006,1(6):90/94. [5] Wang Q,Sevim H.Open pit production planning through pitgeneration and pitsequencing[J].Transactions of the Society for Mining,Metallurgy,and Exploration,1994,294:1968/1974. [6] 金丹.矿山生态系统物能流核算[J].煤炭学报,2011,36(4):711/712.(Jin Dan.MEFA in mine ecosystem[J].Journal of China Coal Society,2011,36(4):711/712.) [7] Odell C J.Integration of sustainability into the mine design process[D].Vancouver:University of British Columbia,2004. [8] Molotilov S G,Norri V K,Cheskidov V I,et al.Natureoriented open coal mining technologies using minedout space in an open pit[J].Journal of Mining Science,2006,42(6):622/627. [9] Gu X W,Wang Q,Ge S.Dynamic phasemining optimization in openpit metal mines[J].Transactions of Nonferrous Metals Society of China,2010,20(10):1974/1980.