ZHOU Bing-hai, LI Ming. Scheduling Method for Multi-cluster Tools with Diverse Wafer Flow Patterns[J]. Journal of Northeastern University Natural Science, 2016, 37(5): 697-701.
[1]Venkatesh S,Davenport R,Foxhoven P,et al.A steady-state throughput analysis of cluster tools:dual-blade versus single-blade robots[J].IEEE Transactions on Semiconductor Manufacturing,1997,10(4):418-424. [2]Yoon H J,Lee D Y.On-line scheduling of integrated single wafer processing tools with temporal constraints[J]. IEEE Transactions on Semiconductor Manufacturing,2005,18(3):390-398. [3]Zhou B H,Li X.Try and error-based scheduling algorithm for cluster tools of wafer fabrications with residency time constraints[J].Journal of Central South University of Technology,2012,19(1):187-192. [4]Zhou B H,Gao Z S,Chen J.Scheduling algorithm for dual-arm cluster tools with residency and reentrant constraints[J].Journal of Central South University of Technology,2014,21(1):160-166. [5]Yi J,Ding S,Song D,et al.Steady-state throughput and scheduling analysis of multi-cluster tools:a decomposition approach[J].IEEE Transactions on Automation Science and Engineering,2008,5(2):321-336. [6]Chan W K,Yi J,Ding S.Optimal scheduling of multi-cluster tools with constant robot moving times,part I:two-cluster analysis[J].IEEE Transactions on Automation Science Engineering,2011,8(1):5-16. [7]Chan W K,Yi J,Ding S.Optimal scheduling of multicluster tools with constant robot moving times,part II:tree-like topology configurations[J].IEEE Transactions on Automation Science Engineering,2011,8(1):17-28. [8]石萧铭,周炳海.带驻留约束及双臂机械手的集束型设备群调度算法[J].上海交通大学学报,2013,47(4):650-655.(Shi Xiao-ming,Zhou Bing-hai.Scheduling algorithm for dual-arm multi-cluster tools with residency constraints [J].Journal of Shanghai Jiaotong University,2013,47(4):650-655.) [9]Liu M X,Zhou B H.Modeling and scheduling analysis of multi-cluster tools with residency constraints based on time constraint sets[J].International Journal of Production Research,2013,51(16):4835-4852. [10]Dechter R,Meiri I,Pear J.Temporal constraint networks[J].Artificial Intelligence,1991,49(1/2/3):61-95. [11]Kim H J,Lee J H,Kim C H,et al.Scheduling in-line multiple cluster tools:a decomposition approach[C]// IEEE International Conference on Mechatronics and Automation.Chengdu,2012:1544-1549.