东北大学学报(自然科学版) ›› 2011, Vol. 32 ›› Issue (9): 1336-1339.DOI: -

• 论著 • 上一篇    下一篇

上盘矿柱诱导冒落回收力学分析

徐帅;李元辉;杨宇江;戴星航;   

  1. 东北大学资源与土木工程学院;
  • 收稿日期:2013-06-19 修回日期:2013-06-19 发布日期:2013-04-04
  • 通讯作者: -
  • 作者简介:-
  • 基金资助:
    国家重点基础研究计划项目(2010CB732006);;

Mechanic analysis of retrieval for collapse induced by upper plate jamb

Xu, Shuai (1); Li, Yuan-Hui (1); Yang, Yu-Jiang (1); Dai, Xing-Hang (1)   

  1. (1) School of Resources and Civil Engineering, Northeastern University, Shenyang 110819, China
  • Received:2013-06-19 Revised:2013-06-19 Published:2013-04-04
  • Contact: Xu, S.
  • About author:-
  • Supported by:
    -

摘要: 针对缓倾斜、中厚矿体高效开采方法研究中,上盘岩体含水、破碎,回采爆破易造成该岩体损伤、破坏而导致贫化过早,涌水量增大,矿石结块,放矿困难等问题,提出预留上盘矿柱,减缓爆破震动对上盘围岩损伤;同时在下分段布置诱导炮孔,破坏残留区域根基,诱导预留矿柱冒落,达到回收矿柱的目的.采用Flac3d对回采过程中预留矿柱的应力、位移、塑性区等扩展、发育过程中力学机制进行模拟分析,反演了回采过程中预留矿柱对减缓上盘岩层破坏力学过程,得出在分段上盘预留2 m厚的三角保护矿柱,可有效地控制塑性区的发展,有利于维持上盘的稳定性,且在下分段拉槽时,进行诱导崩落,可以将该矿柱完全回收.

关键词: 缓倾斜矿体上盘, 预留矿柱, 诱导冒落, 力学分析

Abstract: This paper proposes an original technique in the fields of efficient mining methods concerning flat pitch and medium-thick fragmented ore. In view of the fact that the upper lithosome is hydrated and readily broken, and that the damage caused by the vibration of stopping blasting may contribute to the premature depletion, increase of water inflow, agglomeration and ore drawing difficulty, the upper plate should be reserved in order to diminish the damage of the surrounding upper lithosome caused by the blasting vibration. Concurrently, the induced blasting holes should be displayed in the lower area in order to destroy the roots of remaining areas and to induce the reserved jambs to maintain collapsing. Using Flac3d, mechanics of the stress, displacement changes and plastic forming of the reserved jambs were simulated and analyzed during the extending and developing process. And it demonstrated the mechanic process that reserved jambs may reduce the damage of upper plate terrain during the stopping. Then it is concluded that a triangular protecting jamb with 2 m thickness should be reserved in the upper plate, which is helpful for the development of the plastic forming and the maintenance of the upper plate stability. Also the conduct of induced collapse during the slot cutting of the lower plate may lead to the complete retrieval of this jamb.

中图分类号: