XUE Xi-long, WANG Xin-min, HU Yong, YANG Li. Ecological Security Effect Evaluation of Mine Based on Fuzzy Analytical Hierarchy Process and Variable Fuzzy Sets[J]. Journal of Northeastern University Natural Science, 2016, 37(1): 94-99.
[1]Wang Z D.Application of green bio-mining technology for coal under villages in environmental protection[J].Journal of Chemical and Pharmaceutical Research,2014,6(6):2120-2124. [2]Favas P J C,Pratas J,Gomes M E P,et al.Selective chemical extraction of heavy metals in tailings and soils contaminated by mining activity:environmental implications[J].Journal of Geochemical Exploration,2011,111(3):160-171. [3]刘亮.矿山环境效应影响评价系统研究[D].西安:西安科技大学,2006.(Liu Liang.The systematic research of evaluation on the minearl’s environmental effect influence[D].Xi’an:Xi’an University of Scinece and Technology,2006.) [4]齐朔风.矿山生态安全的BP神经网络评价方法与应用研究[D].太原:太原理工大学,2010.(Qi Shuo-feng.The evaluation methods and applied research of BP neural network on mine ecological safety[D].Taiyuan:Taiyuan University of Technology,2010.) [5]曾晟,杜雪明,谭凯旋.基于广义线性理论的铀矿生态环境安全评价[J].矿冶工程,2014,34(2):27-30.(Zeng Sheng,Du Xue-ming,Tan Kai-xuan.Evaluation of eco-environmental security for uranium mine based on generalized linear theory[J].Mining and Metallurgical Engineering,2014,34(2):27-30.) [6]Chen S Y,Guo Y.Variable fuzzy sets and its application in comprehensive risk evaluation for flood-control engineering system[J].Fuzzy Optimization and Decision Making,2006,5(2):153-162. [7]Zhang D,Wang G L,Zhou H C.Assessment on agricultural drought risk based on variable fuzzy sets model[J].Chinese Geographical Science,2011,21(2):167-175. [8]Zhang X L,Wang L H.Choosing an appropriate construction project delivery method using FAHP in China[C]// 2009 IEEE the 16th International Conference on Industrial Engineering and Engineering Management.Beijing,2009:78-82. [9]徐泽水.模糊互补判断矩阵的相容性及一致性研究[J].解放军理工大学(自然科学版),2002,3(2):94-96.(Xu Ze-shui.Research on compatibility and consistency of fuzzy complementary judgement matrices[J].Journal of PLA University of Science and Technology(Natural Science),2002,3(2):94-96.) [10]Frouz J,Kalík J,Velichová V.Factors causing spatial heterogeneity in soil properties,plant cover,and soil fauna in a non-reclaimed post-mining site[J].Ecological Engineering,2011,37:1910-1913. [11]Benzaazoua M,Bussière B,Demers I,et al.Integrated mine tailings management by combining environmental desulphurization and cemented paste backfill:application to mine Doyon,Quebec,Canada[J].Minerals Engineering,2008,21(4):330-340. [12]Liu D J,Zou Z H.Water quality evaluation based on improved fuzzy matter-element method[J].Journal of Environmental Sciences,2012,24(7):1210-1216.