LI Zhi, SU Fuyong, WEN Zhi, LIU Xunliang. Application of Improved Genetic Algorithm in Gas Dispatching of Iron and Steel Enterprise[J]. Journal of Northeastern University Natural Science, 2014, 35(5): 645-649.
[1] 齐二石,孔海宁,何曙光.钢铁企业副产煤气多周期动态优化调度[J].系统工程理论与实践,2010,30(11):2071/2079.(Qi Ershi,Kong Haining,He Shuguang.Multiperiod optimal byproduct gas scheduling in iron and steel industry[J].Systems EngineeringTheory & Practice,2010,30(11):2071/2079.) [2] 吕斌,谢安国.层次分析法在钢铁生产能耗分析中的应用[J].鞍山钢铁学院学报,2001,24(5):333/336.(Lyu Bin,Xie Anguo.Application of analytic hierarchy process to analysis of energy consumption produced during making iron and steel[J].Journal of Anshan Institute of Iron & Steel Technology,2001,24(5):333/336.) [3] 阎涛.模糊技术在煤气调度中的应用研究[J].煤气与热力,1998,3(3):333/336.(Yan Tao.Applied research of fuzzy technology on city gas dispatch[J].Gas & Heat,1998,3(3):333/336.) [4] Ponnambalam S,Jawahar N.A mutiobjective genetic algorithm for job shop scheduling[J].Production Planning and Control,2001,12(8):764/774. [5] 鲁延京,陈英武,杨志伟.求解约束优化问题的粒子进化变异遗传算法[J].控制与决策,2012,27(10):1441/1446.(Lu Yanjing,Chen Yingwu,Yang Zhiwei.Improved GA with particle swarm’s evolutionary strategy for solving constrained optimization problems[J].Control and Decision,2012,27(10):1441/1446.) [6] Assil I P,Bakirrzis A.Varying fitness function in genetic algorithm constrained optimization:the cutting stock and unit commitment problems[J].IEEE Transactions on System,Man and Cybernetics,1998,28(5):629/640. [7] Syswerda G.Uniform crossover in genetic algorithms[C]//Proceeding of the Third OCGA.San Mateo,1989:2/9. [8] Su R.On the linear equivalents of nonlinear systems[J].Systems & Control Letters,1982,2:48/52. [9] Ye Z W,Zheng Z B.Research on the configuration of parameter α,β,ρ in ant algorithm exemplified by TSP[C]//Proceedings of the International Conference on Machine Learning and Cybernetics.Xi’an,2003:2106/2111.