ZHOU Jian, XIAO Hao-feng, WANG Xiao-hu. Pull System Design Based on Value Stream Mapping for ETO Products[J]. Journal of Northeastern University:Natural Science, 2015, 36(10): 1501-1505.
[1]Ohno T.Toyota production system:beyond large-scale production [M].Portland:Productivity Press,1988:1-17. [2]Hopp W J,Spearman M L.To pull or not to pull:what is the question?[J].Manufacturing and Service Operations Management,2004,6(2):133-148. [3]Lu J C,Yang T,Wang C Y.A lean pull system design analyzed by value stream mapping and multiple criteria decision-making method under demand uncertainty [J].International Journal of Computer Integrated Manufacturing,2011,24(3):211-228. [4]Yang L R.Key practices,manufacturing capability and attainment of manufacturing goals:the perspective of project/engineer-to-order manufacturing [J].International Journal of Project Management,2013,31(1):109-125. [5]Merschmann U,Thonemann U W.Supply chain flexibility,uncertainty and firm performance:an empirical analysis of German manufacturing firms [J]. International Journal of Production Economics,2011,130(1):43-53. [6]Hopp W J,Spearman M L.Factory physics [M].Illinois:Waveland Press,2011:287-339. [7]Rother M,Shook J.Learning to see [M].Boston:Lean Enterprise Institute,1999:5-17 [8]Detty R B.Quantifying benefits of conversion to lean manufacturing with discrete event simulation:a case study [J].International Journal of Production Research,2000,38(2):429-445. [9]Lian Y H.Analyzing the effects of lean manufacturing using a value stream mapping-based simulation generator [J]. International Journal of Production Research,2007,45(13):3037-3058. [10]McDonald T,Van Aken E M,Rentes A F.Utilizing simulation to enhance value stream mapping:a manufacturing case application [J].International Journal of Logistics,2002,5(2):213-232. [11]Standridge C R,Marvel J H.Why lean needs simulation[C]//The 38th Winter Simulation Conference.Monterey,2006:1907-1913. [12]Schroer B J.Simulation as a tool in understanding the concepts of lean manufacturing [J]. Simulation,2004,80(3):171-175. [13]Monden Y.Toyota production system:an integrated approach to just-in-time [M].Boca Raton:CRC Press,2011:72-84.