ZHOU Bing-hai, WANG Teng, FANG Teng. Scheduling Multiple Orders per Job with Various Constraints[J]. Journal of Northeastern University:Natural Science, 2015, 36(10): 1506-1511.
[1]Qu P,Mason S J.Using tabu search on the single machine multi-orders per job scheduling problem [C]//IIE Annual Conference and Exhibition. Houston:Institute of Industrial Engineers,2004:1831-1835. [2]Sobeyko O,Monch L.Genetic algorithms to solve a single machine multiple orders per job scheduling problem [C]//2010 Winter Simulation Conference. Piscataway:IEEE,2010:2493 – 2503. [3]Jampani J,Mason S J.Column generation heuristics for multiple machine,multiple orders per job scheduling problems[J].Annals of Operations Research,2008,159(1):261-273. [4]Mason S J,Chen J S.Scheduling multiple orders per job in a single machine to minimize total completion time[J]. European Journal of Operational Research,2010,207(1):70-77. [5]Erramilli V,Mason S J.Multiple orders per job compatible batch scheduling[J].IEEE Transactions on Electronics Packaging Manufacturing,2006,29 (4):285-296. [6]Erramilli V,Mason S J.Multiple orders per job batch scheduling with incompatible jobs[J].Annals of Operations Research,2008,159(1):245-260. [7]Chen J S.Optimization models for the flow-shop scheduling problem with multiple orders per job[C]//The 40th International Conference on Computers and Industrial Engineering.Piscataway:IEEE,2010:1-6. [8]Zhou B H,Zhai Z Q.Lifetime distribution model of port facilities with pitting corrosion of stochastic processes[J].Applied Mechanics and Materials,2011,44:46-50. [9]Shen L X,Wu Y B.Single machine past-sequence-dependent delivery times scheduling with general position-dependent and time-dependent learning effects[J]. Applied Mathematical Modelling,2013,37(7):5444-5451. [10]Qu P,Mason S J.Metaheuristic scheduling of 300 mm jobs containing multiple orders[J]. IEEE Transactions on Semiconductor Manufacturing,2005,18(4):633-643. [11]Pfund M,Fowler J W,Gadkari A,et al.Scheduling jobs on parallel machines with setup times and ready times[J]. Computers & Industrial Engineering,2008,54(4):764-782.