ZHAI Hui-chao, REN Feng-yu, NAN Shi-qing. Stage Blasting Technology of Large and Thick Steeply Inclined Orebody[J]. Journal of Northeastern University Natural Science, 2017, 38(10): 1486-1490.
[1]Nan S Q,Gao Q,Liu Z H.Numerical simulation of fluid-solid coupling in surrounding rock and parameter optimization for filling mining[J].Procedia Engineering,2011,26:1639-1647. [2]于清军,胡忠强,李元辉.急倾斜厚大矿体阶段深孔空场崩落联合采矿法[J].金属矿山,2015(3):14-18.(Yu Qing-jun,Hu Zhong-qiang,Li Yuan-hui.Stage deep hole open-stope and caving combined mining method for steeply inclined thick ore-body[J].Metal Mine,2015(3):14-18.) [3]Lu W B,Yang J H,Chen M,et al.An equivalent method for blasting vibration simulation[J].Simulation Modelling Practice and Theory,2011,19(9):2050-2062. [4]Zheng Z T,Xu Y,Dong J H,et al.Hard rock deep hole cutting blasting technology in vertical shaft freezing bedrock section construction[J].Journal of Vibroengineering,2015,17(3):1105-1119. [5]Yu T R.New blast damage criteria for underground blasting[J].CIM Bulletin,1996,89(3):139-145. [6]Itasca Consulting Group Inc.FLAC3D(fast lagranginan analysis of continua in 3 dimensions) [M].Minneapolis:Itasca Consulting Group Inc,2005. [7]Rodriguez R,Torano J,Menendez M.Prediction of the airblast wave effects near a tunnel advanced by drilling and blasting[J].Tunneling Underground Space Technology,2007,22:241-251. [8]Zhu Z Q,Liu Q Y,Zeng F H,et al.Effective grouting area of jointed slope and stress deformation responses by numerical analysis with FLAC3D[J].Journal of Science and Engineering(China),2009,15(4):404-408. [9]胡建军.基于FLAC3D的露天转地下磷矿山矿块结构参数优化[J].矿业研究与开发,2013, 33(4):1-3.(Hu Jian-jun.Optimization of structural parameters of ore block for the transition from open-pit to underground mining in a phosphate mine based on FLAC3D[J].Mining R& D,2013, 33(4):1-3.) [10]任凤玉,翟会超.VCR法开掘采空区充填井技术研究[J].有色金属(矿山部分),2012, 64(1):45-47.(Ren Feng-yu,Zhai Hui-chao.Study on VCR method to excavate packed well of gob[J].Nonferrous Metals(Mining Section),2012,64(1):45-47.)