LIANG Li, LIU Qi, LI Ming. Dam-Break Risk Assessment Model of Tailings Reservoir Based on Variable Weight Synthesis and Analytic Hierarchy Process[J]. Journal of Northeastern University Natural Science, 2017, 38(12): 1790-1794.
[1]Hu J,Liu X Z.Design and implementation of tailings dam security monitoring system[J].Procedia Engineering,2011,26:1914-1921. [2]Shen L Y,Luo S H,Zeng X K,et al.Review on anti-seepage technology development of tailings pond in China[J].Procedia Engineering,2011,26:1803-1809. [3]Ishihara K,Ueno K,Yamada S,et al.Breach of a tailings dam in the 2011 earthquake in Japan [J].Soil Dynamics and Earthquake Engineering,2015,68:3-22. [4]张超,杨春和,徐卫亚.尾矿坝稳定性的可靠度分析[J].岩土力学,2004,25(11):1706-1711.(Zhang Chao,Yang Chun-he,Xu Wei-ya.Reliability analysis of tailings dam stability[J].Rock and Soil Mechanics,2004,25(11):1706-1711.) [5]Li Q M,Wang Y H,Li G.Tailings dam breach disaster on-line monitoring method and system realization [J].Procedia Engineering,2011,26:1674-1681. [6]Sammarco O.A tragic disaster caused by the failure of tailings dams leads to the formation of the stave foundation [J].Mine Water and the Environment,2004,23(2):91-95. [7]Mittal H K,Morgenstern N R.Parameters or the design of tailings dams [J].Canadian Geotechnical Journal,1975,12(2):235-261. [8]Wang P Z.A factor spaces approach to knowledge representation [J].Fuzzy Sets and Systems,1990,36(1):113-124.