Integrated Optimization Model of Multi-period Open-Pit Mine Production Scheduling

SUN Xiao-yu1, DENG Peng-hong2, ZHAO Ming3   

  1. 1. School of Resources & Civil Engineering, Northeastern University, Shenyang 110819, China; 2. Resources Planning Management Department, Ansteel Mining Company, Anshan 114004, China; 3. Open-Pit Mine Engineering Business Unit, CCTEG Shenyang Engineering Company, Shenyang 110015, China.
  • Received:2015-11-16 Revised:2015-11-16 Online:2016-10-15 Published:2016-10-14
  • Contact: SUN Xiao-yu
  • About author:-
  • Supported by:
    -

Abstract: To solve the integrative optimization of multi-period plans in the applications of open pit production only focused on single-period or multi-period optimization with mathematical optimization methods, a 0-1 integer programming model for the integrated optimization was proposed on the basis of previous works of 0-1 integer programming models for “before and after” periods and for “large and small” periods. The corresponding improvement measures were put forward for low computing speed. The model realizes the integrative optimization of multi-period plan, avoids the potential danger of no solution to the discrete optimization, and also guarantees the computational speed and accuracy. The model can be used to verify upper plan with lower plan and to derive upper plan from lower plan, and shows a better adaptability and versatility.

Key words: open-pit mine, production scheduling, 0-1 integer programming, linear programming, integrative optimization, multi-period