Time-Varying Reliability Analysis of Turning Chatter
EN Xi-nong1, ZHANG Yi-min2, HUANG Xian-zhen1
1. School of Mechanical Engineering & Automation, Northeastern University, Shenyang 110819, China; 2. Equipment Reliability Institute, Shenyang University of Chemical Technology, Shenyang 110142, China.
[1]Campocasso S,Costes J P,Fromentin G,et al.A generalised geometrical model of turning operations for cutting force modeling using edge discretisation[J].Applied Mathematical Modeling,2015,39:6612-6630. [2]Li H,Lai X,Li C,et al.Modeling and experimental analysis of the effects of tool wear,minimum chip thickness and micro tool geometry on the surface roughness in micro-end-milling[J].Journal of Micromechanics and Microengineering,2007,18(2):025006. [3]Malakooti B,Wang J,Tandler E C.A sensor-based accelerated approach for multi-attribute machinability and tool life evaluation[J].The International Journal of Production Research,1990,28(12):2373-2392. [4]Naves V T G,Da Silva M B,Da Silva F J.Evaluation of the effect of application of cutting fluid at high pressure on tool wear during turning operation of AISI 316 austenitic stainless steel[J].Wear,2013,302(1):1201-1208. [5]Cascón I,Sarasua J A.Mechanistic model for prediction of cutting forces in turning of non-axisymmetric parts[J].Procedia CIRP,2015,31:435-440. [6]Schueller G I.A state-of-the-art report on computational stochastic mechanics[J].Probabilistic Engineering Mechanics,1997,12(4):197-321. [7]Sudret B,Der Kiureghian A.Stochastic finite element methods and reliability:a state-of-the-art report[J].University of California Berkeley,2000,11:189. [8]Singh A,Mourelatos Z,Nikolaidis E.Time-dependent reliability of random dynamic systems using time-series modeling and importance sampling[J].SAE International Journal of Materials and Manufacturing,2011,4(1):929-946 [9]González-Fernández R A.Reliability assessment of time-dependent systems via sequential cross-entropy Monte Carlo simulation[J].IEEE Transactions on Power Systems,2011,26(4):2381-2389. [10]Andrieu-Renaud C,Sudret B,Lemaire M.The PHI2 method:a way to compute time-variant reliability[J].Reliability Engineering and System Safety,2004,84(1):75-86. [11]Hu Z,Du X.First order reliability method for time-variant problems using series expansions[J].Structural and Multidisciplinary Optimization,2015,51(1):1-21. [12]Bourinet J M,Deheeger F,Lemaire M.Assessing small failure probabilities by combined subset simulation and support vector machines[J].Structural Safety,2011,33(6):343-353. [13]Papadopoulos V,Giovanis D G,Lagaros N D,et al.Accelerated subset simulation with neural networks for reliability analysis[J].Computer Methods in Applied Mechanics and Engineering,2012,223:70-80. [14]Echard B,Gayton N,Lemaire M,et al.A combined importance sampling and Kriging reliability method for small failure probabilities with time-demanding numerical models[J].Reliability Engineering & System Safety,2013,111:232-240. [15]Fu X,Zheng S.New approach in dynamics of regenerative chatter research of turning[J].Communications in Nonlinear Science & Numerical Simulation,2014,19(11):4013-4023. [16]胡寿松.自动控制原理[M].北京:科学出版社,2007.(Hu Shou-song.Principle of automatic control[M].Beijing:Science Press,2007.) [17]Baumgrtner A,Binder K.Applications of the Monte Carlo method in statistical physics[M].Berlin:Springer-Verlag,1987. [18]Bichon B J,Eldred M S,Swiler L P,et al.Efficient global reliability analysis for nonlinear implicit performance functions[J].AIAA Journal,2008,46(10):2459-2468. [19]Liu Y,Li T X,Liu K,et al.Chatter reliability prediction of turning process system with uncertainties[J].Mechanical Systems and Signal Processing,2016,66/67:232-247.