YANG Qiang, SUN Zhili, ZHAO Xin, ZHANG Lei. Reliable Life Prediction for Special Equipments with the Measurable Potential Failure Mode[J]. Journal of Northeastern University Natural Science, 2014, 35(1): 88-92.
[1] Marhavilas P K,Koulouriotis D,Gemeni V.Risk analysis andassessment methodologies in the work sites:on a review,classification and comparative study of the scientific literature of the period 2000/2009[J].Journal of Loss Prevention in the Process Industries,2011,24(5):477/523. [2] Pinto A,Nunes I L,Ribeiro R A.Occupational risk assessment in construction industry—overview and reflection[J].Safety Science,2011,49(5):616/624. [3] Li D C,Chang F M,Chen K C.Building reliability growth model using sequential experiments and the Bayesian theorem for small datasets [J].Expert Systems with Applications,2010,37(4):3434/3443. [4] Paokanta P,Harnpornchai N,Chakpitak N,et al.Parameter estimation of binomial logistic regression based on classical (maximum likelihood) and Bayesian (MCMC) approach for screening βThalassemia[J].International Journal of Intelligent Information Processing,2012,3(1):90/100. [5] 明志茂,张云安,陶俊勇,等.研制阶段系统可靠性增长的Bayesian评估与预测[J].机械工程学报,2010,46(4):150/155.(Ming Zhimao,Zhang Yunan,Tao Junyong,et al.Bayesian reliability assessment and prediction during product development[J].Journal of Mechanical Engineering,2010,46(1):150/155. [6] Ozden C,Kadir O,Ovunc T,et al.Fatigue life prediction of existing crane runway girders[J].Journal of Constructional Steel Research,2010,66(11):1164/1173. [7] Kopnov V A.Fatigue life prediction of the metalwork of a traveling gantry crane [J].Engineering Failure Analysis,1999,6(3):131/141. [8] 徐格宁,范小宁,陆凤仪,等.起重机焊接箱形梁疲劳可靠度及初始裂纹的蒙特卡罗仿真[J].机械工程学报,2011,47(20):41/44.(Xu Gening,Fan Xiaoning,Lu Fengyi,et al.Monte Carlo simulation of fatigue reliabilities and initial cracks for welded box girders of crane[J].Journal of Mechanical Engineering,2011,47(20):41/44.)