ZHOU Bing-hai, TAN Fen. Scheduling Method of Material Delivery for Automotive Assembly Lines Based on Milk-Run Delivery[J]. Journal of Northeastern University Natural Science, 2018, 39(3): 389-393.
[1]Boysen N,Emde S,Hoeck M,et al.Part logistics in the automotive industry:decision problems,literature review and research agenda[J].European Journal of Operational Research,2015,242(1):107-120. [2]Emde S,Boysen N.Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines[J].European Journal of Operational Research,2012,217(2):287-299. [3]Golz J,Gujjula R,Günther H O,et al.Part feeding at high-variant mixed-model assembly lines[J].Flexible Services and Manufacturing Journal,2012,24(2):119-141. [4]Fathi M,Rodríguez V,Alvarez M J.A novel memetic ant colony optimization-based heuristic algorithm for solving the assembly line part feeding problem[J].The International Journal of Advanced Manufacturing Technology,2014,75(1/2/3/4):629-643. [5]Fathi M,Alvarez M J,Mehraban F H,et al.A multiobjective optimization algorithm to solve the part feeding problem in mixed-model assembly lines[J].Mathematical Problems in Engineering,2014,2014(1):1-12. [6]Rao Y Q,Wang M C,Wang K P,et al.Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line[J].Computers & Operations Research,2013,40(11):2599-2610. [7]Fathi M,Rodríguez V,Fontes D B M M,et al.A modified particle swarm optimization algorithm to solve the part feeding problem at assembly lines[J].International Journal of Production Research,2016,54(3):878-893. [8]Abdollahpour S,Rezaian J.Minimizing makespan for flow shop scheduling problem with intermediate buffers by using hybrid approach of artificial immune system[J].Applied Soft Computing,2015,28:44-56. [9]Emde S,Gendreau M.Scheduling in-house transport vehicles to feed parts to automotive assembly lines[J].European Journal of Operational Research,2017,260(1):255-267. [10]周炳海,王腾,方腾.考虑多约束的MOJ调度问题[J].东北大学学报(自然科学版),2015,36(10):1506-1510.(Zhou Bing-hai,Wang Teng,Fang Teng.Scheduling multiple orders per job with various constraints[J].Journal of Northeastern University(Natural Science),2015,36(10):1506-1510.) [11]Singh M R,Mahapatra S S.A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks[J].International Journal of Advanced Manufacturing Technology,2012,62(1/2/3/4):267-277.