1. School of Automation, Northwestern Polytechnical University, Xi’an 710129, China; 2. School of Information and Control Engineering, Liaoning Shihua University, Fushun 113001, China.
LI Qing-rui, LI Ping, ZHANG Peng. Chaotic Optimization of Smith Predictor[J]. Journal of Northeastern University Natural Science, 2015, 36(8): 1093-1096.
[1]朱晓东,王军,万红.基于Smith预估的纯滞后系统的控制[J].郑州大学学报:工学版, 2004,25(1):77-81. (Zhu Xiao-dong,Wang Jun,Wan Hong.Control of the system with pure time delay based on Smith predictive algorithm[J].Journal of Zhengzhou University:Engineering Science, 2004,25(1):77-81.) [2]李旭,张殿华,何立平,等. 冷轧监控AGC智能Smith预估器的算法设计[J].系统仿真学报,2009,21(14):4405-4408.(Li Xu,Zhang Dian-hua,He Li-ping,et al.Algorithmic design of intelligent Smith prediction controller for monitor AGC in cold mill[J].Journal of System Simulation,2009,21(14):4405-4408.) [3]李迅,宋东球,喻寿益,等.基于模型参考自适应Smith预估器的反馈式AC厚度控制系统[J].控制理论与应用,2009,26(9):999-1003.(Li Xun,Song Dong-qiu,Yu Shou-yi,et al.Feedback automatic gauge control system using model reference adaptive Smith predictor[J].Control Theory & Applications,2009,26(9):999-1003.) [4]唐彪,段小刚,沈平,等.积分时滞系统的Fuzzy-Smith预估器的研究[J].控制工程,2010,17(sup2):69-72.(Tang Biao,Duan Xiao-gang,Shen Ping,et al.Analysis of fuzzy-Smith predictor for integrating plus dead-time plants[J]. Control Engineering of China,2010,17(sup2):69-72.) [5]Rong H G,Zheng H,Li Z Q,et al.Tuning of fuzzy PID controller for Smith predictor[J].Journal of Central South University,2010,17(3):566-571. [6]侯威,封国林,董文杰.基于复杂度分析logistic映射和Lorenz模型的研究[J].物理学报,2005,54(8):3940-3945.(Hou Wei,Feng Guo-lin,Dong Wen-jie.Investigation about the Lorenz model and logistic equation based on the complexity[J].Acta Physica Sinica,2005,54(8):3940-3945.) [7]洪镇南,王旭东.Smith预估补偿器及其应用[J].控制工程,2002,9(5):69-71.(Hong Zhen-nan,Wang Xu-dong.Smith’s predictive compensator and its application[J].Control Engineering of China,2002,9(5):69-71.) [8]薛美盛,孙德敏,罗海云.自适应Smith预估器仿真研究[J].工业仪表与自动化装置, 2009,45(6):3-5.(Xue Mei-sheng,Sun De-min,Luo Hai-yun.A simulation study of an adaptive Smith predictor[J].Industrial Instrumentation & Automation,2009,45(6):3-5.)