SUN Xiao-yu, DENG Peng-hong, ZHAO Ming. Integrated Optimization Model of Multi-period Open-Pit Mine Production Scheduling[J]. Journal of Northeastern University Natural Science, 2016, 37(10): 1460-1464.
[1]L’Heureux G,Gamache M,Soumis F.Mixed integer programming model for short term planning in open-pit mines[J].Mining Technology, 2013,122(2):101-109. [2]Newman A M,Rubio E,Caro R,et al.A review of operations research in mine planning [J].Interfaces,2010,40(3):222-245. [3]Lestage P,Mottola L,Scherrer R,et al.A computerized tool for short range production planning at Mount Wright[C]// Proceedings of International Symposium on the Application of Computers and Operations Research in the Mining Industries (APCOM XXIV).Montreal:Springer,1993:67-74. [4]Smith M L.Optimizing short-term production schedules in surface mining:integrating mine modeling software with ANIPL/CPLEX[J].International Journal of Surface Mining,Reclamation,and Environment,1998,12(4):149-155. [5]Eivazy H,Askari-Nasab H.A mixed integer linear programming model for short-term open pit mine production scheduling[J].Mining Technology, 2012,121(2):97-108. [6]Askari-Nasab H,Pourrahimian Y,Ben-Awuhae E,et al.Mixed integer linear programming formulations for open pit production scheduling [J].Journal of Mining Science, 2011,47(3):338-359. [7]Bolanda N,Dumitrescub I,Froylandb G,et al.LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity[J].Computers & Operations Research, 2009,36:1064-1089. [8]Caccetta L,Hill S P.An application of branch and cut to open pit mine scheduling[J]. Journal of Global Optimization, 2003,27:349-365. [9]李建祥,王青.多时段露天开采短期计划优化[J].金属矿山,2001(4):1-4,18.(Li Jian-xiang,Wang Qing.Optimization of the short-term production scheduling of multi-period opencasting[J].Metal Mine,2001(4):1-4,18.) [10]李建祥,吴会江,唐立新.考虑规整性的露天矿短期生产调度模型[J].系统工程理论与实践,2005,25(3):119-124.(Li Jian-xiang,Wu Hui-jiang,Tang Li-xin.A model with regularity for open pit mine short term production scheduling[J].Systems Engineering—Theory & Practice,2005,25(3):119-124.) [11]李建祥,吴会江.基于距离的开采区域规整性测度及其几点性质[J].矿业研究与开发,2005,25(6):16-17,66.(Li Jian-xiang,Wu Hui-jiang.Distance-based regularity measure of mining area and its attributes[J].Mining Research and Development, 2005,25(6):16-17,66.) [12]Ramazan S,Dagdelen K,Johnson T B.Fundamental tree algorithm in optimizing production scheduling for open pit mine design[J].Mining Technology,2005,114(1):45-54. [13]Ramazan S,Dimitrakopoulos R.Recent applications of operations research in open pit mining[J].Transactions of the Society for Mining,Metallurgy and Exploration,2004,316:73-78. [14]Ramazan S.The new fundamental tree algorithm for production scheduling of open pit mines[J].European Journal of Operational Research,2007,177:1153-1166. [15]孙效玉,张维国,陈毓,等.根据露天矿长期计划自动形成短期计划的0-1整数规划方法[J].煤炭学报,2012,37(7):1139-1143.(Sun Xiao-yu,Zhang Wei-guo,Chen Yu,et al.Automatic formation of short-term plan based on the long-term on open-pit mine using 0-1 integer programming[J]. Journal of China Coal Society, 2012,37(7):1139-1143.) [16]孙效玉,张维国,孙梦红.自动优化露天矿短期进度计划的渐进细化法[J].东北大学学报(自然科学版),2012,33(5):735-738.(Sun Xiao-yu,Zhang Wei-guo,Sun Meng-hong.Progressive thinning algorithm for automatic optimization of short-term scheduling of open-pit mine[J].Journal of Northeastern University (Natural Science),2012,33(5):735-738.)