WANG Qing , XU Xiaochuan , GU Xiaowei , ZHENG Youyi. Effects of Changing Cost and Price on Final Pit of Openpit Coal Mine[J]. Journal of Northeastern University, 2013, 34(5): 712-714.
[1] Akbari A D,Osanloo M,Shirazi M A.Reserve estimation of an open pit mine under price uncertainty by real option approach[J].Mining Science and Technology,2009,19(6):709/711. [2] Lerchs H,Grossmann I.Optimum design of openpit mines[J].Canadian Institute of Mining,Metallurgy and Petroleum Bulletin,1965,58(1):17/24. [3] Dowd P A,OnurA H.Openpit optimizationpart1:optimal openpit design[J].Transactions of The Institution of Mining and MetalLurgy,1993,102:A95/A104. [4] Dimitrakopoulos R,Martinez L,Ramazan S.A maximum upside/minimum downside approach to the traditional optimization of open pit mine design[J].Journal of Mining Science,2007,1(43):73/82. [5] Jakako S E,AtaeePour M,Shahriar K.Pit limits optimization using a stochastic process[J].Canadian Institute of Mining Magazine,2006,1(6):90/94. [6] Kim Y C.Ultimate pit limit design methodologies using computer models/the state of the art[J].Mining Engineering,1978,Oct:1454/1459. [7] Hooman A N.Intelligent 3D interactive open pit mine planning and optimization[D].Libraryand:Heritage Branch,2006. [8] Gu X W,Wang P F,Wang Q,et al.Simultaneous optimization of final pit and production schedule in openpit coal mines[J].Innovation Manufacturing and Engineering Management,2011,323(10):222/228. [9] Gu X W,Wang Q,Ge S.Dynamic phasemining optimization in openpit metal mines[J].Transactions of Nonferrous Metals Society of China,2010,20(10):1974/1980.